Roof Repair Smedway handles Roof Installation for new builds across Sod, from initial dry-in through final shingle course, to current code.


We work directly with Sod general contractors to hit dry-in deadlines without cutting corners on the actual installation.
We also provide builders with a clear timeline upfront, so Roof Installation scheduling can be built into the overall project plan with confidence.
Insurance certificates provided directly to general contractors as needed for Sod permits.
We slot into tight Sod build schedules without needing weeks of lead time.
Written Roof Installation bids are provided before groundbreaking whenever architectural plans allow.
Every Roof Installation install meets current Sod, WV building code for decking, underlayment, and ventilation.
Here's the range of Roof Installation work our Sod crews handle for new builds.
We prioritize dry-in scheduling to keep your build on track for interior work to begin.
Shingle installation follows manufacturer spec and current Sod, WV code for nail pattern and exposure.
Metal roofing on new construction integrates cleanly with proper planning from the framing stage.
Proper ventilation gets built in from the start on new construction, not retrofitted after the fact.
Before the final building inspection, we walk the roof to confirm everything meets Sod, WV code requirements.
Getting flashing right during initial construction is far cheaper than retrofitting it after issues appear.

New construction Roof Installation work follows the same care as repair work, just coordinated against a build timeline.
We confirm decking is ready and materials are staged before the crew mobilizes.
Builder-specific requirements are confirmed in writing before work begins.
The Roof Installation is completed to code and manufacturer spec, with a pre-inspection walkthrough before final sign-off.

Our GC said they were easier to coordinate with than most subcontractors on the project.
— Sod Homeowner
They flagged a decking issue early enough that it didn't delay the timeline.
— Sod Homeowner
Crew was professional and worked well alongside our other trades on-site.
— Sod Homeowner
Communicated proactively whenever a weather delay pushed our Roof Installation schedule back a day.
— Sod Homeowner

We work directly with Sod permitting offices to keep Roof Installation projects on schedule.
